# Page 423
|
||||
# NAME -- IMU PERFORMANCE TESTS 2
|
||||
#
|
||||
# DATE -- MARCH 20, 1967
|
||||
#
|
||||
# BY -- SYSTEM TEST GROUP 864-6900 EXT. 1274
|
||||
#
|
||||
# MODNO. -- ZERO
|
||||
# NAME- IMU PERFORMANCE TESTS 2
|
||||
|
||||
# DATE- MARCH 20,1967
|
||||
#
|
||||
# BY- SYSTEM TEST GROUP 864-6900 EXT. 1274
|
||||
|
||||
# MODNO.- ZERO
|
||||
|
||||
# FUNCTIONAL DESCRIPTION
|
||||
#
|
||||
|
||||
# POSITIONING ROUTINES FOR THE IMU PERFORMANCE TESTS AS WELL AS SOME OF
|
||||
# THE TESTS THEMSELVES. FOR A DESCRIPTION OF THESE SUBROUTINES AND THE
|
||||
# OPERATING PROCEDURES (TYPICALLY) SEE STG MEMO 685.THEORETICAL REF.E-1973
|
||||
@ -122,7 +122,6 @@ NBPOSPL CA DEC17
|
||||
EXTEND
|
||||
DCA PERFDLAY
|
||||
TC LONGCALL
|
||||
SBANK= LOWSUPER # RSB 2004, OH 2009: Ask Ron
|
||||
EBANK= POSITON
|
||||
2CADR GOESTIMS
|
||||
|
||||
@ -320,7 +319,7 @@ ZEROING1 TS ZERONDX1
|
||||
SETLOC IMUCAL3
|
||||
BANK
|
||||
ERTHRVSE DLOAD PDDL
|
||||
SCHZEROS # PD24 = (SIN (missing) -COS (missing) 0)(OMEG/MS)
|
||||
SCHZEROS # PD24 = (SIN -COS 0)(OMEG/MS)
|
||||
LATITUDE
|
||||
COS DCOMP
|
||||
PDDL SIN
|
||||
@ -381,6 +380,7 @@ SHOW1 CA POSITON
|
||||
TC QPLACE # V33
|
||||
TCF SHOW1
|
||||
|
||||
|
||||
OC14400 OCT 14400
|
||||
3990DEC = OMEG/MS
|
||||
VB06N98 VN 0698
|
||||
@ -393,6 +393,7 @@ XNBADR GENADR XNB
|
||||
XSMADR GENADR XSM
|
||||
OMEG/MS 2DEC .24339048
|
||||
|
||||
|
||||
P11OUT TC BANKCALL
|
||||
CADR MATRXJOB # RETURN TO P11
|
||||
|
||||
@ -419,79 +420,78 @@ FINETIME INHINT # RETURNS WITH INTERRUPT INHIBITED
|
||||
TC Q
|
||||
|
||||
# Page 432
|
||||
# PROGRAM NAME: OPTIMUM PRELAUNCH ALIGNMENT CALIBRATION
|
||||
# DATE: NOVEMBER 2 1966
|
||||
# BY: GEORGE SCHMIDT IL 7-146 EXT. 126
|
||||
# PROGRAM NAME-OPTIMUM PRELAUNCH ALIGNMENT CALIBRATION
|
||||
# DATE- NOVEMBER 2 1966
|
||||
# BY- GEORGE SCHMIDT IL 7-146 EXT. 126
|
||||
# MOD NO 3
|
||||
#
|
||||
# FUNCTIONAL DESCRIPTION
|
||||
#
|
||||
|
||||
# THIS SECTION CONSISTS OF PRELAUNCH ALIGNMENT AND GYRO DRIFT TESTS
|
||||
# INTEGRATED TOGETHER TO SAVE WORDS. COMPASS IS COMPLETELY RESTART
|
||||
# PROOFED EXCEPT FOR THE FIRST 30 SECONDS OR SO. PERFORMANCE TESTS OF
|
||||
# THE IRIGS IS RESTART PROOFED ENOUGH TO GIVE 75 PERCENT CONFIDENCE THAT
|
||||
# IF A RESTART OCCURS THE DATA WILL STILL BE GOOD. GOOD PRACTICE TO RECYCL
|
||||
# WHEN A RESTART OCCURS UNLESS IT HAPPENS NEAR THE END OF A TEST -- THEN WAIT
|
||||
# WHEN A RESTART OCCURS UNLESS IT HAPPENS NEAR THE END OF A TEST-THEN WAIT
|
||||
# FOR THE DATA TO FLASH.
|
||||
#
|
||||
# A RESTART IN GYROCOMPASS DURING GYRO TORQUING CAUSES PULSES TO BE LOST.
|
||||
# A RESTART IN GYROCOMPASS DURING GYRO TORQUING CAUSES PULSES TO BE LOST
|
||||
# THE PRELAUNCH ALIGNMENT TECHNIQUE IS BASICALLY THE SAME AS IN BLOCK 1
|
||||
# EXCEPT THAT IT HAS BEEN SIMPLIFIED IN THE SENSE THAT SMALL ANGLE APPROX.
|
||||
# HAVE BEEN USED. THE DRIFT TESTS USE A UNIQUE IMPLEMENTATION OF THE
|
||||
# OPTIMUM STATISTICAL FILTER. FOR A DESCRIPTION SEE E-1973.BOTH OF THESE
|
||||
# ROUTINES USE STANDARD SYSTEM TEST LEADIN PROCEDURES. THE INITIALIZATION
|
||||
# PROCEDURE THE DRIFT TESTS IS IN THE JDC'S. THE INITIALIZATION METHOD
|
||||
# PROCEDURE THE DRIFT TESTS IS IN THE JDC S. THE INITIALIZATION METHOD
|
||||
# FOR GYROCOMPASS IS AN ERAS LOAD THEN A MISSION PHASE CALL.
|
||||
# THE COMPASS ALIGNS TO Z DOWN,X DOWNRANGE, HAS THE CAPABILITY
|
||||
# CHANGE AZIMUTH WHILE RUNNING , IS COMPENSATED FOR
|
||||
# COMPONENT ERRORS,IS CAPABLE OF OPTICAL VERIFICATION( CSM ONLY).
|
||||
#
|
||||
|
||||
# COMPASS ERASABLE LOAD REQUIRED
|
||||
#
|
||||
# 1. LAUNCHAZ-DP AZIMUTH IN REV FROM NORTH OF XSM DESIRED (NOM=.2)
|
||||
# 2. LATITUDE-DP-OF LAUNCH PAD
|
||||
# 3. AZIMUTH-DP-OF ZNB OF VEHICLE
|
||||
# 4. IMU COMPENSATION PARAMETERS
|
||||
# 5. AZ AND ELEVATION OF TARGETS 1,2 ****OPTIONAL****
|
||||
#
|
||||
|
||||
# 1-LAUNCHAZ -DP AZIMUTH IN REV FROM NORTH OF XSM DESIRED (NOM=.2)
|
||||
# 2- LATITUDE -DP-OF LAUNCH PAD
|
||||
# 3- AZIMUTH-DP-OF ZNB OF VEHICLE
|
||||
# 4- IMU COMPENSATION PARAMETERS
|
||||
# 5-AZ AND ELEVATION OF TARGETS 1,2 ****OPTIONAL****
|
||||
|
||||
# TO PERFORM AS PART OF COMPASS
|
||||
#
|
||||
# 1. OPTICAL VERIFICATION: V 65 E
|
||||
# 2. AZIMUTH CHANGE: V 78 E
|
||||
#
|
||||
|
||||
# 1-OPTICAL VERIFICATION- V 65 E
|
||||
# 2-AZIMUTH CHANGE-V 78 E
|
||||
|
||||
# SUBROUTINES CALLED
|
||||
#
|
||||
|
||||
# DURING OPTICAL VERIFICATION (CSM ONLY) ESSENTIALLY ALL OF INFLIGHT ALIGN
|
||||
# IS CALLED IN ONE WAY OR ANOTHER. SEE THE LISTING.
|
||||
#
|
||||
|
||||
# NORMAL EXIT
|
||||
#
|
||||
# DRIFT TESTS. LENGTHOT GOES TO ZERO-RETURN TO IMU PERF TEST2 CONTROL
|
||||
# GYROCOMPASS-MANY, SEE THE LISTING.
|
||||
#
|
||||
|
||||
# DRIFT TESTS- LENGTHOT GOES TO ZERO-RETURN TO IMU PERF TEST2 CONTROL
|
||||
# GYROCOMPASS-MANY, SEE THE LISTING
|
||||
# ALARMS
|
||||
#
|
||||
|
||||
# 1600 OVERFLOW IN DRIFT TEST
|
||||
# Page 433
|
||||
# 1601 BAD IMU TORQUE ABORT
|
||||
# 1602 BAD OPTICS DURING VERIFICATION-RETURN TO COMPASS CSM ONLY
|
||||
#
|
||||
|
||||
# OUTPUT
|
||||
#
|
||||
# DRIFT TESTS: FLASHING DISPLAYS OF RESULTS-CONTROLLED IN IMU PERF TESTS 2
|
||||
|
||||
# DRIFT TESTS- FLASHING DISPLAYS OF RESULTS-CONTROLLED IN IMU PERF TESTS 2
|
||||
# COMPASS-PROGRAM MODE LIGHTS TELL YOU WHAT PHAS OF PROGRAM YOU ARE IN
|
||||
# 01 INITIALIZING THE PLATFORM POSITION AND ERASABLE
|
||||
# 02 GYROCOMPASSING
|
||||
# 03 DOING OPTICAL VERIFICATION (CSM)
|
||||
#
|
||||
# DEBRIS
|
||||
#
|
||||
# DEBRIS
|
||||
|
||||
# ALL CENTRALS,ALL OF EBANK XSM
|
||||
|
||||
# Page 434
|
||||
# MOST OF THE ROUTINES COMMON TO ALIGNMENT AND CALIBRATION APPEAR
|
||||
# ON THE NEXT FEW PAGES.
|
||||
|
||||
|
||||
COUNT 33/P02
|
||||
|
||||
EBANK= XSM
|
||||
@ -546,7 +546,7 @@ RSTGTS1 INHINT # COMES HERE PHASE1 RESTART
|
||||
# COMES HERE AT THE END OF EVERY ITERATION THROUGH DRIFT TEST OR COMPASS
|
||||
|
||||
# SET UP WAITLIST SECTION
|
||||
SLEEPIE TS LENGTHOT # TEST NOT OVER-DECREMENT LENGHOT
|
||||
SLEEPIE TS LENGTHOT # TEST NOT OVER-DECREMENT LENGTHOT
|
||||
TC PHASCHNG # CHANGE PHASE
|
||||
OCT 00135
|
||||
CCS TORQNDX # ARE WE DOING VERTDRIFT
|
||||
@ -573,6 +573,7 @@ WTGTSMPL TC TWIDDLE
|
||||
RIGHTGTS CAF FOUR # SET UP NEXT WAITLIST-ALLOW SOME TIME
|
||||
TC WTGTSMPL # END OF WAITLIST SECTION
|
||||
|
||||
|
||||
# STORE AND LOAD DATA SECTIONS FOR RESTART PROOFING
|
||||
|
||||
25DECML EQUALS OCT31
|
||||
@ -598,6 +599,7 @@ LOADSTDT CAF 25DECML
|
||||
TCF LOADSTDT +1
|
||||
TC Q
|
||||
|
||||
|
||||
# COMES HERE EVERY ITERATION BY A WAITLIST CALL SET IN SLEEPIE
|
||||
|
||||
ALLOOP CA TIME1
|
||||
@ -741,6 +743,7 @@ ALKLP LXC,1 SXA,1
|
||||
ALKLP
|
||||
8D
|
||||
|
||||
|
||||
LOOSE DLOAD* PDDL* # EXTRAPOLATE SWAY VARIABLES
|
||||
ACCWD +8D,1
|
||||
VLAUN +8D,1
|
||||
@ -760,6 +763,7 @@ LOOSE DLOAD* PDDL* # EXTRAPOLATE SWAY VARIABLES
|
||||
TIX,1
|
||||
LOOSE
|
||||
|
||||
|
||||
AXT,2 AXT,1 # EVALUATE SINES AND COSINES
|
||||
6
|
||||
2
|
||||
@ -785,9 +789,9 @@ PERFERAS EXIT
|
||||
TC LAT(SPL) # GO TO ERASABLE ONLY TO RETURN
|
||||
|
||||
# CAUTION
|
||||
#
|
||||
|
||||
# THE ERASABLE PROGRAM THAT DOES THE CALCULATIONS MUST BE LOADED
|
||||
# BEFORE ANY ATTEMPT IS MAKE TO RUN THE IMU PERFORMANCE TEST
|
||||
# BEFORE ANY ATTEMPT IS MADE TO RUN THE IMU PERFORMANCE TEST
|
||||
|
||||
EBANK= LENGTHOT
|
||||
ONCEMORE CCS LENGTHOT
|
||||
@ -825,6 +829,7 @@ TORQINCH TC PHASCHNG
|
||||
EXIT
|
||||
TC TORQUE # GO TO IMU2 FOR A PIPA TEST AND DISPLAY
|
||||
|
||||
|
||||
SOMEERRR TC ALARM
|
||||
OCT 1600
|
||||
TC +3
|
||||
@ -834,7 +839,9 @@ SOMERR2 TC ALARM
|
||||
OCT 00005
|
||||
TC ENDTEST1
|
||||
|
||||
# THE FAMOUS MAGIC NUMBERS OF SCHMIDT ARE NOW PART OF AN ERASABLE LOAD
|
||||
|
||||
# THE FAMOUS MAGIC NUMBERS OF SCHMIDT ARE NOW PART OF AN ERASABLE LOAD.
|
||||
|
||||
|
||||
DEC585 OCT 02222 # 1170 B+14 ORDER IS NOW IMPORTANT
|
||||
SCHZEROS 2DEC .00000000
|
||||
@ -852,9 +859,9 @@ SOUPLY 2DEC .93505870 # INITIAL GAINS FOR PIP OUTPUTS
|
||||
|
||||
77DECML DEC 77
|
||||
ALXXXZ GENADR ALX1S -1
|
||||
|
||||
# GYROCOMPASS PORTIONS FINISH THIS LOG SECTION
|
||||
|
||||
|
||||
COUNT 33/P01
|
||||
|
||||
# INITIALIZATION SECTION
|
||||
@ -868,7 +875,7 @@ GTSCPSS CA FLAGWRD1 # CALLED BY V37
|
||||
OCT 1521 # NODO ALARM FOR P01 - P11 ALREADY DONE
|
||||
|
||||
GTSCPSSA CAF ONE
|
||||
TS GEOCOMP1 # THIS IS THE LEAD IN FOR COMPASS
|
||||
TS GEOCOMP1 # THIS IS THE LEAD IN FOR COMPASS.
|
||||
CA 1/PIPAGT
|
||||
TS 1/PIPADT
|
||||
NXXTENN CA BIT8
|
||||
@ -1074,7 +1081,7 @@ CHKCOMED INHINT
|
||||
RELINT
|
||||
GOBKCALB TC Q
|
||||
|
||||
PRELTERM CA PRIO22 # PRELAUNCH DONE -- SET UP P11
|
||||
PRELTERM CA PRIO22 # PRELAUNCH DONE - SET UP P11
|
||||
TC PRIOCHNG # INCREASE PRIORITY HIGHER THAN SERVICER
|
||||
INHINT
|
||||
TC POSTJUMP
|
||||
@ -1105,9 +1112,9 @@ GCOMPVER TC PHASCHNG # OPTICAL VERIFICATION ROUTINE
|
||||
SETNBPOS TC NBPOSPL
|
||||
TC BANKCALL
|
||||
CADR MKRELEAS
|
||||
OPTDATA CAF BIT1 # CALLS FOR AZIMUTH AND ELEVATION OF TARGET
|
||||
ZL # 1, THEN TARGET 2
|
||||
LXCH RUN # AZIMUTH CLOCKWISE FROM NORTH TO TARGET
|
||||
OPTDATA CAF BIT1 # CALLS FOR AZIMUTH AND ELEVATION OF TARGE
|
||||
ZL # T 1,THEN TARGET 2
|
||||
LXCH RUN # AZIMUTH CLOCKWSE FROM NORTH TO TARGET
|
||||
TS DSPTEM1 +2 # ELEVATION MEASURED FROM HORIZONTAL
|
||||
EXTEND
|
||||
INDEX RUN
|
||||
@ -1132,13 +1139,14 @@ VN0641 VN 0641
|
||||
TS L
|
||||
TCF OPTDATA +2 # MPAC 1ST PASS=0 2ND PASS=2
|
||||
|
||||
|
||||
TC CONTIN33
|
||||
|
||||
V05N30E VN 0530
|
||||
|
||||
TC INTPRET # UNDYNAMIC ASSEMBLER
|
||||
TAR/EREF AXT,1 AXT,2 # TARGET VECTOR
|
||||
2 # SIN(EL) -COS(AZ)COS(EL) SIN(AZ)COS(EL)
|
||||
2 # SIN(EL) -COS(AZ)COS(EL) SIN(AZ)COS(EL
|
||||
12D
|
||||
SSP SETPD
|
||||
S2
|
||||
@ -1396,4 +1404,3 @@ VN0629 VN 0629
|
||||
|
||||
# Page 455
|
||||
# *** END OF COMAID .029 ***
|
||||
|
||||
|