b13b2ae0a4
* Update CONTRACT_AND_APPROVALS.agc * add missing stars * align start of line * minor change * minor change * minor fix * minor fix * final fix for line * replace tabl by space * typo * align date * Restore hard 8 tabs & final corrections * Remove rogue .
74 lines
3.4 KiB
Plaintext
74 lines
3.4 KiB
Plaintext
# Copyright: Public domain.
|
|
# Filename: CONTRACT_AND_APPROVALS.agc
|
|
# Purpose: Part of the source code for Colossus 2A, AKA Comanche 055.
|
|
# It is part of the source code for the Command Module's (CM)
|
|
# Apollo Guidance Computer (AGC), for Apollo 11.
|
|
# Assembler: yaYUL
|
|
# Contact: Ron Burkey <info@sandroid.org>.
|
|
# Website: www.ibiblio.org/apollo.
|
|
# Mod history: 2009-05-06 RSB Transcribed from page images.
|
|
#
|
|
# This source code has been transcribed or otherwise adapted from digitized
|
|
# images of a hardcopy from the MIT Museum. The digitization was performed
|
|
# by Paul Fjeld, and arranged for by Deborah Douglas of the Museum. Many
|
|
# thanks to both. The images (with suitable reduction in storage size and
|
|
# consequent reduction in image quality as well) are available online at
|
|
# www.ibiblio.org/apollo. If for some reason you find that the images are
|
|
# illegible, contact me at info@sandroid.org about getting access to the
|
|
# (much) higher-quality images which Paul actually created.
|
|
#
|
|
# Notations on the hardcopy document read, in part:
|
|
#
|
|
# Assemble revision 055 of AGC program Comanche by NASA
|
|
# 2021113-051. 10:28 APR. 1, 1969
|
|
|
|
# Page 1
|
|
|
|
|
|
# ************************************************************************
|
|
# * *
|
|
# * THIS AGC PROGRAM SHALL ALSO BE REFERRED TO AS: *
|
|
# * *
|
|
# * *
|
|
# * COLOSSUS 2A *
|
|
# * *
|
|
# * *
|
|
# * THIS PROGRAM IS INTENDED FOR USE IN THE CM AS SPECIFIED *
|
|
# * IN REPORT R-577. THIS PROGRAM WAS PREPARED UNDER DSR *
|
|
# * PROJECT 55-23870, SPONSORED BY THE MANNED SPACECRAFT *
|
|
# * CENTER OF THE NATIONAL AERONAUTICS AND SPACE *
|
|
# * ADMINISTRATION THROUGH CONTRACT NAS 9-4065 WITH THE *
|
|
# * INSTRUMENTATION LABORATORY, MASSACHUSETTS INSTITUTE OF *
|
|
# * TECHNOLOGY, CAMBRIDGE, MASS. *
|
|
# * *
|
|
# ************************************************************************
|
|
|
|
|
|
# SUBMITTED: MARGARET H. HAMILTON DATE: 28 MAR 69
|
|
# M.H.HAMILTON, COLOSSUS PROGRAMMING LEADER
|
|
# APOLLO GUIDANCE AND NAVIGATION
|
|
|
|
# APPROVED: DANIEL J. LICKLY DATE: 28 MAR 69
|
|
# D.J.LICKLY, DIRECTOR, MISSION PROGRAM DEVELOPMENT
|
|
# APOLLO GUIDANCE AND NAVIGATION PROGRAM
|
|
|
|
# APPROVED: FRED H. MARTIN DATE: 28 MAR 69
|
|
# FRED H. MARTIN, COLOSSUS PROJECT MANGER
|
|
# APOLLO GUIDANCE AND NAVIGATION PROGRAM
|
|
|
|
# APPROVED: NORMAN E.SEARS DATE: 28 MAR 69
|
|
# N.E. SEARS, DIRECTOR, MISSION DEVELOPMENT
|
|
# APOLLO GUIDANCE AND NAVIGATION PROGRAM
|
|
|
|
# APPROVED: RICHARD H. BATTIN DATE: 28 MAR 69
|
|
# R.H. BATTIN, DIRECTOR, MISSION DEVELOPMENT
|
|
# APOLLO GUIDANCE AND NAVIGATION PROGRAM
|
|
|
|
# APPROVED: DAVID G. HOAG DATE: 28 MAR 69
|
|
# D.G. HOAG, DIRECTOR
|
|
# APOLLO GUIDANCE AND NAVIGATION PROGRAM
|
|
|
|
# APPROVED: RALPH R. RAGAN DATE: 28 MAR 69
|
|
# R.R. RAGAN, DEPUTY DIRECTOR
|
|
# INSTRUMENTATION LABORATORY
|